GOLD CIL PROCESSING LINE

Introduction: Gold CIL (Carbon in Leach) Process is an efficient design of extracting and recovering gold from its ore. By cyaniding and carbon leaching crushed gold ore slurry simultaneously, CIL process lower the gold mining operation cost and increase gold recovery rate to a degree of 99%. It has become the first choice of modern gold mining and beneficiation plant design.

Application: CIL mainly applies for the process of above 1g/t grade gold ore and gold ore with large bearing ore volume: silver, platinum, copper, etc. As CIL sees a better performance in extracting these minerals at the same time. And Xinhai Mineral Dressing Test Center can help you with the component testing of your ores.

  • Descriptions:
  • Successful Case
Descriptions:

After Crushing and Comminution, add the gold ore slurry into 9 Leaching Agitation Tanks, pour in cyanide solution in the first 2 tanks and Activated Carbon in the following 7 tanks for the reverse-absorption process–This design shortens the time period of gold staying in the cyanide pregnant solution and recovers gold in advance, which sees a faster investment return compared to other designs.

Filter Press and Vibrating Screen is needed in gold ore slurry reverse-transmission process.

Xinhai has a design that ensures the minimum carbon gold loses during transmission. It lower the gold loses and the processing line is easy to maintain.

After the carbon leaching and Elution of gold, NaCN and NaOH solution is used for removing the gold from loaded carbon at a high temperature. Then the loaded solution passes through the electro winning cell and the metals are attached to cathodes.

Xinhai Desorption Electrolysis System can successfully aggregate these steps in one processing unit, the pure gold and other useful metals are highly attained via this system.

Successful Case

Xinhai Tanzania 1200tpd gold mineral processing project is located in Africa,thus has big differences from domestic one in project management, construction technology,resource supply and work coordination.Mainly includes thickening,cyaninding and desorption electrosis parts.Main work of the installation and commissioning includes: 1.Install the equipment such as thickening,cyaniding,desorption electrosis system. 2.Install the pipelines and operation platforms (exclude tailings pipelines of outdoors); 3.The electric power, water supply and drainage.(exclude water supply from water source)